How do I design a pivot irrigation system?
Water, soil and a circle
HOLDREGE, Nebraska — Design a center pivot by working out your field's peak water need, your well's capacity, and your soil's intake rate, then picking a length, sprinkler package and pump that fit those numbers. It's a job for a qualified designer, but you should understand the pieces well enough to ask good questions and check the answer.
Start with the field
Measure the field, note obstacles such as trees, power lines and gullies, and map soil types. A pivot covers a circle, so square fields leave corners. Decide whether corners matter enough to justify a corner system or a different layout. Use Web Soil Survey for soil data.
Match capacity to crop need
The pivot's flow per acre must at least cover peak crop water use at your system's efficiency. Many designers also leave some buffer for downtime and hot spells. A well that can't supply the needed flow means a smaller circle or a lower design capacity. Verify what your supply and your water rights allow.
Choose the sprinkler package
Low-pressure nozzles save energy but put water down at high rates under the outer spans, which can cause runoff on heavy or sloping soil. Lower application rates need larger wetted diameters or boom-style packages. Ask the dealer to show application rate along the span and compare it to your soil's intake rate.
Size pump, pipe and power
Total pressure requirement includes pivot pressure, elevation change and friction in the mainline. Size the pump for that duty point and check the pump curve. Make sure electrical service or engine power can support it. A power-line extension can cost more than the pivot, so ask early.
Consider controls and features
Variable-rate nozzles, GPS panels, remote monitoring and end-gun controls add cost and capability. Add those you'll actually use. Wheel tracks need to be passable, so consider tire size and soil.
Plan the paperwork and cost-share
Check permits, water rights and any local rules. NRCS programs sometimes offer cost-share for efficient irrigation, and details change often, so contact your local office through the service center locator.
Questions for pivot dealers
- What is the design flow per acre and pressure at the pivot point?
- What is application rate under the last tower?
- What are the power and pump requirements?
- What parts and service are local?
Get at least two bids with the same assumptions. UNL CropWatch and the NRCS publish helpful design resources.
Span length and tower spacing
Spans and towers set how rough ground and tire loads work out. Heavier, longer spans cost less per acre but need better wheel tracks. Check soil strength and field slope, since pivots on steep ground need good alignment and stronger drive equipment. The dealer should be able to show the maximum slope the model handles.
Sprinkler package and nozzle spacing
On a pivot, the outer towers move faster, so the nozzles near the end put out more water per foot. The design handles this by increasing flow with distance from the center. Check the nozzle chart and ask how it was calculated for your pressure. A poor package is hard to fix later.
Wheel track and tire choice
Tire size and wheel-track soil shape how deeply the tracks rut. Wide tires, sound track soil and good drainage help. Ruts can bog a tower and are expensive to repair. Ask about options for soft soils.
Power and controls
Pivots run on electric tower motors from a generator or the grid, so check that your power can handle the demand. Look at panel features such as start and stop, reversing, end gun control, safety shutdowns and remote monitoring. Pick what you'll actually use. Think about lightning protection and surge suppression, too.
Costs to ask about
Beyond the machine itself, ask about delivery, pad construction, electrical service, mainline pipe, pump, trenching, startup and training. Those items can rival the cost of the pivot. Get a total installed price in writing, and ask what the warranty covers and who services it.
A pivot sits in the field for decades. Spend a few extra evenings on the plan.