How do I install a compliant fish screen?

Steps from approval to the first cleaning

YAKIMA, Washington — Installing a compliant fish screen is mostly a paperwork-first, shovel-second job. The screen that works best is the one your state fish agency has already looked at and approved for your flow, so the order of operations matters more than the brand of mesh.

Start with the criteria, not the catalog

Before you shop, find out which criteria apply to your diversion. State fish and wildlife agencies publish screening standards, and some run programs that review designs or help with installation. Those standards typically specify the maximum opening size, how fast water can approach the screen face, how much screen area you need for your flow, and how the screen should sit relative to the stream.

Write down your maximum diversion rate. Everything else is calculated from it. If you only know it in "about what the pump does" terms, measure it. A flow meter, a calibrated weir or a simple timed fill of a known volume will get you a number you can use.

Pick the right type for your diversion

Different diversions call for different screens:

Bigger flows mean bigger structures and usually engineered drawings. A small pump may be a weekend job. A canal headworks is a project with a budget line and a permit.

Check permits before you disturb the bank

Working in or near a stream usually triggers permits. Expect to talk to the state fish and wildlife agency, the state water agency, and possibly the U.S. Army Corps of Engineers or a local planning office. Some states restrict in-water work to specific windows so you don't disturb spawning or migrating fish. If you schedule the work for when it's convenient, and the window closed last month, the rest of the plan is academic.

Your NRCS field office can often point you to the right contacts and sometimes provides technical design help. Find yours with the service center locator.

Installation steps

  1. Get written approval of your design or product from the responsible agency.
  2. Mark your diversion rate and confirm the screen's rated capacity exceeds it.
  3. Schedule in-water work inside the permitted window.
  4. Set the screen so the face lines up with the flow as the design requires. Orientation affects whether fish slide past or get pinned.
  5. Seal every edge. Gaps around a frame defeat the whole purpose, because a fingerling will find the one spot you missed.
  6. Secure the structure against high water. Spring runoff has taken out plenty of good installs.
  7. Test with the pump running or the gate open, and watch the water behavior across the whole face.

Maintenance plan

A compliant screen drifts out of compliance as it fills with leaves, algae and silt. Build cleaning into your regular irrigation routine. Many farmers check it every time they check the pump, and after any storm. Brushes, a spray wand or an automatic cleaner can handle most debris. Replace torn mesh quickly, since one hole makes the whole screen moot.

Keep a simple log with the date of each check, what you found and what you did. Inspectors like a record, and so will you if a question ever comes up about whether the screen was working.

Costs and cost-share

Costs depend on flow, design and site conditions, so any number quoted in a magazine is only a rough idea. Look into state screening assistance programs and conservation cost-share through farmers.gov/conservation. Funding availability changes, so ask directly what's open.

Final check

Before you call it done, ask the agency whether they want to inspect the install or sign off on it. Get that approval in writing and file it with your water right documents. If you sell the place someday, the paperwork will be worth more than the screen.