How do I permit a reservoir?
Dams, water rights, and wetlands rules
CASPER, Wyoming — Permitting a reservoir usually involves more than one agency, because you're dealing with three separate questions: whether you have a right to store the water, whether the dam itself meets safety rules, and whether building it disturbs streams or wetlands. Each question has its own office and its own paperwork, and the sequence matters. A pond you can fill with runoff from your own pasture is often treated very differently from a reservoir on a flowing stream, so the first job is to figure out which one you're proposing.
Here's the typical path, with the caveat that details depend on your state and the size of the structure.
Sort out the water right first
In many states, storing water requires a water right or a permit from the state engineer, water board or equivalent, especially in the arid West where stored water is tightly allocated. Some states exempt small stock ponds or small amounts of storage; others require a filing for nearly everything. Capturing runoff, diverting from a stream and filling from a well can each be treated differently.
Call the state water agency before you hire anyone. Ask whether your project needs a storage right, what the filing involves, whether there's a size or capacity threshold, and how long the process normally takes. Applications can be slow and neighbors can protest, so start early. If you don't have the right to store the water, the best engineering in the world can leave you with a very expensive hole.
Dam safety and design
Most states regulate dams above a certain height or storage volume, and they may require engineered plans, a licensed engineer's stamp, construction inspection and later periodic inspections. Smaller farm ponds may be exempt, but exemption from dam safety review doesn't exempt you from responsibility if the embankment fails and floods a road or a neighbor.
Ask your state dam safety office what thresholds apply and what hazard classification your site might fall under, which depends on what's downstream. Consider hiring a qualified engineer anyway. The NRCS has long provided technical help for farm ponds and has conservation practice standards covering pond design, and your local office can tell you what assistance is available and how it works. Eligibility for any technical or financial help is decided by the agency.
Streams, wetlands and federal permits
If your reservoir involves damming a stream, filling a wetland or placing fill in waters regulated under the Clean Water Act, you may need a federal permit, generally administered by the Army Corps of Engineers, along with state water quality certification. A dam across a flowing channel is the classic example. A dug pit in a dry upland field is often not.
Before breaking ground, find out whether wetlands or streams exist on the site. Use the Web Soil Survey to look at hydric soil indicators, and ask your NRCS office about wetland determinations, since farm program eligibility can be affected by wetland conversion. If the site is questionable, ask the Corps district office for a jurisdictional determination before you commit to the design.
Local rules, utilities and land use
Counties and townships often have their own requirements: grading or building permits, floodplain review, setbacks from roads and property lines, and stormwater rules. Utility lines, pipelines and drainage tile complicate siting. Call your state's one-call or utility locating service before digging, and check recorded easements on the parcel.
If the reservoir will affect a neighbor, whether by backwater, seepage or changed flows, talk with them early. Water disputes are some of the oldest in agriculture, and they're rarely settled by surprise.
Funding, insurance and the paper trail
Cost-share may be available for water storage and irrigation efficiency through conservation programs. Check the farmers.gov conservation page and talk with your local service center, which you can find through the service center locator. Programs have signup periods, ranking and rules about starting work before approval, so don't dig until you know whether starting early disqualifies you.
Keep every permit, approval letter, design sheet and inspection report in one folder. When you sell or borrow against the farm, lenders and buyers want to see them. Talk to your insurance agent about liability for impoundments, especially if the reservoir sits upstream of a road or building.
A last practical point is the spillway. Whatever the size of the reservoir, water needs a safe way out during a big storm, and a failed or undersized spillway is the usual way embankments go bad. Ask the engineer or NRCS technician how the spillway was sized and what storm it was designed to pass. Also plan for upkeep: mowing the embankment, keeping woody roots off the dam, watching for seepage and animal burrows, and checking outlet pipes. Muskrats and groundhogs have ended more farm ponds than most people admit, and a dam that is permitted but neglected is still a problem waiting for a wet spring.
Build the reservoir on paper first, with the water right, the engineer, the wetland check and the county sign-off in the right order. The earth moving is the easy part.