What does a water right permit include?

The details that define your water

PIERRE, South Dakota — A water right permit spells out who may use water, how much, from what source, for what purpose, where and when. It usually names the owner, the source, the point of diversion, the amount and rate allowed, the place and purpose of use, the priority date and any conditions. Exact contents vary by state and by whether the water is surface or groundwater, so read yours in full and check with your state agency.

Think of the permit as the boundaries of your right. Use within them is protected, and use outside them can cause trouble.

Who, what and where

The permit identifies the holder by name and address, and often by a permit or file number. It names the source of water: a creek, river, spring, reservoir, or aquifer. It gives the location of the point of diversion, usually by legal description such as section, township and range, or by coordinates.

It also describes the place of use, which is the land where the water may be applied. This is important for irrigation, because the permit may list specific acres or fields. Using the water outside that area can require an amendment or a new approval.

If you use the water for something besides irrigation, such as livestock watering, the permit will say so under purpose of use. Different uses can have different rules and priority. The National Agricultural Law Center offers general background on how agricultural water rights are structured.

How much and how fast

Permits set limits on quantity. These may include a maximum rate of diversion, often in units like cubic feet per second or gallons per minute, and a maximum volume per season or year, often in acre-feet. Some set both. These limits constrain how much you can take at any moment and over the season.

The permit may also set a season of use, such as spring through fall for irrigation. Taking water outside the season can be a violation even if the amount is small.

Understand how the numbers fit your system. A pump capable of moving more than the permit allows is a setup that invites trouble. Check that your pump, pivot and ditch capacity match the allowed rate, and that you have a way to measure what you divert.

Priority and conditions

The priority date is the date that determines your place in line when water is short. In prior appropriation states, earlier dates have seniority. The permit shows this date, and it is one of the most valuable pieces of information on the page.

Conditions are the fine print. They may require measuring devices, reporting, fish screens, bypass flows, notice to downstream users or limits on use in dry periods. Some require development within a set time, called proof of beneficial use, before the right becomes final.

Read the conditions twice. A permit can be valid and still require things you are not doing. Ask your state agency if a condition is unclear, and keep a record of when you complete required steps. Drought and supply information to plan around those limits is available at Drought.gov.

Permits, certificates and related papers

Many states issue a permit first, then a certificate or license once the water has been put to use as required. The permit may be conditional until then. Check which stage your paper represents. A conditional permit that is never perfected can expire.

Related documents include maps, proof of use, transfer or change approvals, and well logs for groundwater. Keep them together with the permit. If you are part of a ditch company or irrigation district, your shares and the entity's rights are separate paper with its own rules.

Not all water use needs a permit. Some states exempt small domestic or stock uses, and the rules vary. Do not assume you are exempt. Ask the agency whether your use requires approval, and get the answer in writing if you can.

Keeping your permit in good standing

Use the water as the permit describes, report when required, and pay any fees. Keep measurement records and maintain devices. If you want to change the place of use, the source or the purpose, apply for approval before you do it, since changes generally cannot harm other users.

Mark your calendar for deadlines. Missed reports or fees can cause problems that are annoying to fix. Store the permit with your farm records and scan a copy.

When you sell or buy land, check how the permit transfers, and talk to a water attorney if anything is uncertain. For farm planning help, start with your local USDA service center through farmers.gov. The permit is a short document that governs a very big part of your operation, and it is worth reading before the first dry July.