How do I rent a concrete mixer?

Choosing and using a rental mixer

BEATRICE, Nebraska — Renting a concrete mixer is simple, but choosing the right size and the right way to get concrete is where farm projects go sideways. For small jobs like a few post footings, a stoop, or a small slab, a portable electric or gas mixer from a rental yard works fine. For anything bigger than a few cubic yards, a ready-mix truck usually beats mixing by hand, because concrete must be placed and finished before it sets and it doesn't wait for anyone.

Start with the math. Measure length, width and thickness of what you're pouring, convert to cubic feet, then to cubic yards. Ask the rental yard or a ready-mix dispatcher to check your figures, and plan a little extra for uneven subgrade. If the answer is more than a modest amount, price a truck delivery, even with a short-load fee, against the labor and hours of mixing batches.

Pick the type of mixer

Rental yards generally offer three kinds. Small electric drum mixers handle bagged mix in batches and are fine for footings and light slabs. Towable gas-powered mixers are larger and move quicker, which suits a barn floor section or a longer fence line. Some yards also rent mortar mixers and paddle mixers, which are meant for mortar or stucco, not coarse concrete. Ask which one you're getting and what batch size it takes, usually quoted in cubic feet.

Ask about power. An electric mixer needs a dedicated circuit or generator of the right size, and extension cords that are too light can cook a motor. A gas unit needs fuel and oil, and the rental agent should show you how to start it and how to tilt and dump.

Plan the pour before the mixer arrives

Prepare the site first. Forms should be set, gravel base compacted, reinforcing bar or wire placed, and tools laid out. Put the mixer near the pour but on level ground, with a path for wheelbarrows that isn't a mud hole. Have water, a hose, shovels, a screed board, a float, an edger and a bull float ready. Recruit help, because mixing, hauling and finishing take more hands than one farmer has.

Choose the mix for the job. Bagged mixes are rated for strength and often specify water per bag. Adding extra water makes the concrete easier to push around and also weaker. Follow the bag directions, and if the slab will carry heavy equipment, livestock traffic or manure acid, ask the supplier or your local NRCS office about mixes and thickness. The Natural Resources Conservation Service provides standards for farm structures that involve concrete, such as waste storage, and those standards are worth checking before you pour anything that holds manure.

Mixing steps that save you grief

  1. Load the drum with part of the water first, then add dry mix gradually.
  2. Mix for the time stated on the bag, usually a few minutes, and avoid overfilling.
  3. Dump into wheelbarrows or directly into forms.
  4. Wash out the drum between batches so hardened chunks don't build up.
  5. Keep batches consistent, same water, same time, so the slab sets evenly.

Weather matters. Hot, windy days make concrete set fast, while cold slows it and can ruin it if it freezes early. Your state extension service can offer guidance on curing in your climate. The eXtension network links to university resources, and your county office can answer local questions.

Safety and cleanup

Wet concrete is caustic. Wear gloves, long sleeves, safety glasses and rubber boots, and rinse skin that gets splashed. Dust from dry mix isn't good to breathe, so use a dust mask when you're dumping bags. Keep guards on the mixer and keep hands out of the drum, even when it's stopped. General farm hazard information is available at OSHA's agriculture page.

Clean the mixer before returning it. Hose out the drum while the concrete is still soft, and knock off drips from the frame. Rental yards often charge for hardened concrete left inside, and a chipping hammer is a miserable way to spend an evening.

Costs and the return

Ask for half-day, daily and weekend rates, plus the deposit and any damage waiver. Compare that to the cost of a short-load truck delivery and a day of hired help. If you pour often, IRS Publication 225 explains how farm building costs and equipment expenses are treated for taxes, though a preparer can say whether your slab is an improvement or a repair. Photograph the mixer on pickup, return it clean, and get a receipt. A flat, smooth slab and an empty drum are the two things that make the day a success.