What should a fabrication contract include?

Scope, price, payment, and what goes wrong

ROANOKE, Virginia — A fabrication contract should name the parties, describe the work, set the price and payment schedule, say who supplies what, set delivery and acceptance terms, and spell out warranty, liability and what happens if someone walks away. It doesn't need to be long. It needs to be clear, because the contract matters most on the day something goes sideways, and on that day nobody remembers the handshake the same way.

Name the parties and describe the work

Start with the legal names of the customer and the shop, plus contact information. If the customer is a farm business, use the business name and the person signing for it. Then describe the work in plain, specific terms: what is being built or repaired, its dimensions, materials, finish, mounting method, and any drawings or sketches attached as part of the agreement.

Vague descriptions cause most disputes. "Build a stock trailer" tells nobody anything. "Build a sixteen-foot gooseneck trailer to the attached drawing, with the listed steel sizes and a primer and one coat of paint" tells everyone what to expect. Attach photos, sketches or a marked-up drawing, and have both parties initial them.

Set price, payment and extras

State whether the price is fixed, an estimate or time and materials. List the payment schedule: a deposit up front, progress payments for longer jobs, and the balance on completion or delivery. Say when payments are due and what happens with late ones, such as interest or the right to hold the finished work until paid.

Add a clause for changes. Any change to the scope should be agreed in writing, with its price and schedule impact. Also say who pays for material price swings, delivery, taxes and permits. Ask your accountant about sales tax rules for custom work, since they vary by state. The IRS Publication 225 explains farm-related tax treatment generally, though it isn't a substitute for professional advice.

Cover materials, schedule and acceptance

Say who buys the materials and who owns them. If the customer supplies steel or parts, add a line saying you aren't responsible for flaws in supplied material and that you may refuse unsuitable stock. If you supply them, state the grade and standard, such as a structural steel designation, so no one argues later.

Give a start date and an estimated completion date, with allowances for weather, material delays and customer changes. Describe acceptance: how the customer inspects the work, how long they have to report problems, and what counts as completion. A short inspection window, such as a few days, is common, but check what suits your work.

  1. Parties and contact details.
  2. Detailed scope with drawings.
  3. Price, deposit and payment schedule.
  4. Materials, schedule and acceptance.
  5. Warranty, liability and dispute terms.

Warranty, liability and insurance

Say what you warrant: workmanship for a stated period, for example, and what you don't, such as damage from misuse, overloading or normal wear. Be careful here. Don't promise a load rating you haven't engineered or tested. If the item will lift, tow or carry people, talk to an attorney and your insurer before taking the job. Many farm insurance policies exclude commercial work, so ask your agent.

Add a limitation of liability if your attorney agrees it suits your state, and define who carries the risk of damage while the item is in your shop. The National Agricultural Law Center offers background on agricultural legal issues, and a local attorney can adapt a template to your state's rules.

Dispute terms, signatures and records

Say how disagreements are handled: talk first, then mediation, then court, with the venue named. Add what happens if either side cancels, including payment for work done and materials bought. Include a clause stating that the written contract is the full agreement and that changes require writing.

Both parties sign and date their copies, and each keeps one. Store them with photos and invoices. The Iowa State Center for Agricultural Law and Taxation and the Ohio State Farm Office publish accessible material on farm contracts and business basics. A good contract sits in a drawer for years, and the day you need it, you'll be glad it was written while everyone was still friends. Read the whole thing aloud once before signing. If a clause makes you or the customer wince, that's the clause to fix now, while it's still cheap. Keep the language plain, and avoid copying legal terms you don't understand from a template; ask your attorney to explain or replace them.