Biogas projects, usually anaerobic digesters that turn manure or other organic waste into gas for heat, electricity or fuel, can be funded through USDA Rural Development's REAP program, NRCS cost-share in some cases, state energy and agriculture programs, loans, and revenue from selling electricity, gas or environmental credits. They're expensive, technically demanding and heavily regulated. Funding helps, but it rarely makes a weak project work.

USDA programs

The Rural Energy for America Program has funded anaerobic digesters, and loan guarantees can help with financing. Ask your state Rural Development office what's available. NRCS has an anaerobic digester conservation practice standard, and EQIP has helped with design and installation in some states, typically on livestock operations with manure management concerns. USDA has also supported feasibility studies and technical help. Check with each agency about current options.

State and utility programs

Some states offer grants, tax incentives, renewable energy credits or fuel program credits for biogas. Utilities may buy power under special agreements. Rules differ widely and interconnection can be a bottleneck. Contact your state energy office and utility early.

Revenue matters as much as grants

A digester has to earn money over years. Potential revenue includes electricity sales, heat use on the farm, renewable natural gas, tipping fees for accepting outside food waste, bedding recovered from digested solids, and environmental credits where markets exist. Credit prices and policies change, so don't build a plan around one price. Be conservative.

Regulation and permits

Expect air, water and waste permits, local zoning and building approvals, and rules on accepting off-farm waste. The EPA has information on biogas systems through its AgSTAR program, and your state environmental agency regulates permits. Contact them before you spend on design.

Questions to answer before you apply

Start with a feasibility study

Before you chase construction money, get an independent feasibility study from an engineer with agricultural digester experience, not only from a vendor. Ask references about operating costs and downtime. Many digesters have struggled because labor, repairs and feedstock variability were underestimated.

Smaller systems and shared projects

Not every project has to be large. Small covered lagoon or farm-scale digesters exist, and some producers partner with neighbors, co-ops or developers for a shared system that processes manure from several farms. Those arrangements have their own legal and financial complications, including who owns the gas, who owns the digestate and who is liable. Have a farm attorney read every agreement before you sign, and talk to your lender. Visit a working digester and ask the operator what they'd do differently. That visit is worth more than a brochure.

Programs and rules vary by state and change often. Confirm with agencies, and consult a CPA and farm attorney before signing contracts. This is general information, not financial or legal advice.