What permits does a farm need?
Fewer than a factory, more than most people expect
The permits a farm needs depend on what you build, what you discharge, what you sell and where you are. Plain cropping on existing fields often needs none, though many states and counties exempt agricultural buildings from some building permit rules but not all of them. Add a new barn, a well, a septic system, a pond, a farm stand, a confinement building or a processing room, and permits start to show up. The way to avoid surprises is to list every project and activity and check each one with the office that handles it.
Permits by project
- Buildings. Many places exempt farm buildings from some building code requirements, but they may still require a zoning or site permit, setbacks and a floodplain review. If the building will have people in it, such as a farm store, a worker house or an event barn, expect fuller code requirements. Electrical permits often apply even where the structure is exempt.
- Septic and wells. Usually handled by the county or state health department. A new house, a bathroom in the shop or a worker housing unit all trigger septic review.
- Water use. Irrigation wells, surface withdrawals and ponds can require state water agency permits or registrations, especially in the West. See the article on water rights.
- Livestock facilities. Larger confined animal operations can fall under state and federal environmental permits, with thresholds that depend on species and numbers. The EPA and your state environmental agency explain how this works. Smaller operations may only need a nutrient management plan or nothing at all.
- Manure and waste storage. Lagoons, storage structures and land application can need design review or a permit.
- Wetlands and streams. Work that fills a wetland or alters a stream can require federal, state or local approval. Ask before you dig. See the wetland article.
- Burning. Brush or crop residue burning often needs a local or state burn permit.
- Roadside sales. A farm stand may need a zoning permit, a sign permit and a driveway or access permit from the road authority.
- Fuel and chemical storage. Larger tanks can carry containment, registration or fire code requirements.
- Events and agritourism. Special use or conditional use permits, health permits for food, and sometimes liquor permits.
- Pesticide application. Certification and, for custom work, a license.
- Livestock movement and sales. Health papers, brand inspection and dealer licenses in some states.
Who to call, in order
- County planning or zoning office. They tell you what land use and building rules apply to your parcel, and often point you to the others.
- County or state health department. For septic, wells and food.
- State department of agriculture. For product, livestock and chemical licensing.
- State environmental and water agencies. For discharge, water use, wetlands and waste.
- Your local NRCS office. They are not a permitting agency, but they help with conservation planning and know which permits tend to come up with certain practices.
The sequence matters
Get permits before construction or purchase, not after. Retroactive permits are harder, cost more and sometimes mean tearing something out. If you need financing, a lender will often ask to see the permits. If you apply for cost share through USDA programs, you may need to show that required permits are in place before work begins, so ask the program office about the order.
Keep the paper
Keep copies of all permits and inspection sign-offs in a farm file, since they matter at sale, for insurance claims and for transfers. A building without a permit trail can cause trouble when you try to sell or insure it.
Permit requirements vary a great deal by state and county, so this is only a framework. It is general information, not legal advice.